Generation projects are won and lost at the connection. We do the studies that get the offer accepted and build the equipment that makes the compliance real.
Turbines and panels are commodities with well-understood performance. What is not commoditized is the connection: the studies, the compliance evidence, the protection coordination, and the negotiation with a network operator who has every reason to be conservative. That is where programs slip and where returns get eroded.
We work both halves. Our consultancy produces the G99 and Grid Code simulation studies, P28 and G5 power quality assessments, protection coordination and EMT modeling, all in DIgSILENT PowerFactory, using validated inverter and PPC models and presented the way the operator wants to read them. Our engineering side then delivers the compensation and storage that the studies committed to.
And where the grid connection is the constraint rather than the goal, GridLink offers a different route entirely: sell the generation directly to a local consumer over a private wire, at a higher unit value than export, with a G99-compliant converter making the arrangement acceptable to the DNO.
Modelling assumptions that do not match the operator's network model send a study pack back, and each round trip costs weeks against a connection window.
Compliance requires reactive capability across the voltage range that inverters alone often cannot deliver at the point of connection, particularly on long collector systems.
Requirements have tightened. Equipment that satisfied an earlier interpretation of G99 may no longer be compliant, and retrofitting compliance late is expensive.
G5 Stage 2 and Stage 3 assessments and P28 studies frequently become the binding constraint on how much capacity can be connected.
Where export capacity is limited or expensive, generation is spilled. Storage or a private wire arrangement converts that spill into revenue.
Substation yards on hillsides and moorland have no indoor space. Everything has to arrive factory-tested, outdoor-rated and craneable.
Each of these is a full solution page. The note explains how it is typically applied here.
G99, Grid Code, P28, G5, protection coordination, insulation coordination and EMT studies for Type A through Type D connections.
Containerized STATCOM and MV SVG for reactive capability, voltage support and fault ride-through at the point of connection.
Grid-forming storage for firming, curtailment recovery, frequency services and black start.
GridLink G99 variant, built to project rating, for direct sale to a local consumer, islanded or grid-parallel.
Site commissioning, witness testing and maintenance across dispersed and remote generation assets.
Remote asset health for sites where an engineer visit is a day trip, not an hour.
Whole-facility protection for hyperscale, colocation and enterprise sites, where the mechanical plant matters as much as the IT load.
Read morePower quality engineering for production lines where a one-cycle disturbance costs a shift: semiconductor, battery, automotive, pharma and food.
Read moreVoltage support, reactive compensation and grid-forming storage for substations at 220 kV and below, deployed where reinforcement is years away.
Read moreRuggedized, containerized power systems for upstream, midstream and offshore operations where an outage is measured in production days.
Read morePumping and treatment sites are energy-intensive, motor-heavy and cannot stop. A natural fit for compensation, storage and private wire supply.
Read moreRolling mills, crushers, hoists and furnaces are the most disruptive loads on any network, and the ones compensation was invented for.
Read moreMost conversations start with an event nobody can fully explain. Send us the alarm log, the single-line diagram, or just the symptom. We will tell you what we would measure first.
Connect with our engineering team for a technical consultation. We'll help you identify risks and uncover efficiency opportunities.
5325 S Moorland RdNew Berlin, WI 53151United States
Units 2 & 3, Kingsley Business ParkNew Road, Kibworth BeauchampLeicestershire, LE8 0LEUnited Kingdom
Fill out the form below and we'll be in touch.