What poor power quality costs a site, and how to measure it
    Power Quality

    What poor power quality costs a site, and how to measure it

    Raveenthan Thambirajah
    November 14, 2025

    Poor power quality costs a site in stoppages, early equipment failure, nuisance trips and higher bills. How to measure your own figure in a few weeks.

    Quick answer

    Poor power quality costs a site through stoppages and scrap from voltage sags, early failure of transformers and motors overheated by harmonics, nuisance trips, higher bills, and output lost to cautious running. To find your own figure, record the incomer and the problem panels for two to four weeks and match each event to the trip log.

    Key takeaways

    • Short events carry most of the cost: a US national laboratory study found interruptions under five minutes caused about two thirds of the national cost of power interruptions.
    • Every 10 degrees C of extra running temperature roughly halves the life of transformer and motor insulation, and harmonic heating gives no warning until something fails.
    • The limits to compare against are published: the US standard IEEE 519 sets 8 percent voltage distortion at low voltage, and the UK's G5/5 uses a 5 percent planning level.

    Most of the cost of poor power quality never appears as a fault report. Voltage dips lasting under a second stop production lines, harmonic heating wears out transformers and motors years early, and operators learn to run the plant below speed to avoid trips. Recording the supply for two to four weeks and matching each event to the trip log turns that into a figure for your own site. If you want yours, send us a month of half-hourly data or your trip log and we will tell you what we would measure first.

    A breaker trips, someone resets it, and the line restarts. That is the part of poor power quality that gets noticed. The rest is spread around the site: a drive that stops for no obvious reason, a transformer that runs warm, motors rewound years early, a line on the bill nobody questions. This page is for facility managers and plant engineers at commercial and industrial sites. Our engineering consultancy team runs power quality studies of this kind.

    What power quality means

    Power quality is how closely the electricity reaching your equipment matches what that equipment was designed for: a steady voltage, a clean 50 or 60 Hz waveform and no interruptions. Four kinds of disturbance cause most of the trouble.

    A voltage sag is a short drop in voltage, usually over within a fraction of a second. The lights barely flicker, but a drive or controller that needs a minimum voltage drops out. Sags come from faults on the network, lightning and large motors starting on your own site.

    Harmonics are distortion of the waveform. Variable speed drives (the electronic controllers that vary a motor's speed), LED lighting, computer power supplies and EV chargers draw current in pulses, and those pulses distort the voltage for everything else on the same supply. Distortion is measured as total harmonic distortion, or THD, a percentage.

    Transients are voltage spikes lasting millionths of a second, from switching or lightning. They wear electronics down over time.

    Power factor measures how much of the current you draw does useful work. Motors and transformers draw some current just to hold their magnetic fields, and once power factor falls below the threshold in your tariff you pay for it separately.

    Where the cost shows up

    Stoppages and scrap come first, and voltage sags are the usual cause of stoppages nobody can explain. A sag deep enough to trip a drive is normally over within half a second, far too fast for a standby generator to help. In one published manufacturer case study, each sag-related stoppage on a single production line cost about $5,000 in lost output and spoiled material. The line was having around 20 a year. That is roughly $100,000 a year from events that each lasted under a second. A widely cited US national laboratory study found the same pattern across the country: power interruptions cost around $80 billion a year, and interruptions under five minutes carried about two thirds of it.

    Equipment wears out early because harmonic currents heat things. In a transformer the extra heating rises steeply with harmonic frequency, so a transformer feeding drive-heavy loads can run hot well below its nameplate rating, and motors get the same heat plus vibration. The rule of thumb for electrical insulation is that every 10 degrees C of extra running temperature roughly halves its life. A transformer running 10 degrees warmer than it should is using up its remaining years at twice the rate. Harmonics also overload neutral conductors in buildings full of single phase electronics, and they stress power factor correction capacitors, which are often the first part to fail.

    Protection trips for faults that are not there. Breakers and relays see a distorted or sagging supply and open, so each one is a stoppage and a callout, and the reset fixes nothing.

    The bill goes up. Harmonics add losses in every cable and transformer on site, and you pay for those losses as consumption. A low power factor appears as a separate charge on half-hourly bills in Great Britain and as a tariff adjustment with many US utilities, every month.

    Then there is the capacity you stop using. A plant that trips too often adapts: operators stagger starts and run machines below rated speed. None of that appears in a maintenance log, which makes it the hardest cost to see.

    If that list sounds like your site, send a month of half-hourly meter data or the trip log to sales@severnde.co.uk (UK) or sales@renewable-d.com (US), and an engineer will tell you what to measure first and where.

    Why the industry figures are not your figure

    The headline numbers are large and they say little about any one site: a European industry survey run in 2007 put the cost of poor power quality at about 150 billion euros a year across the EU, extrapolated from a sample to the whole economy, and a 2018 US national laboratory estimate of sustained interruptions alone came to about 44 billion dollars a year, leaving out the short events that cause most plant stoppages. A figure often quoted from US utility research says around 80 percent of disturbances start inside the customer's own site, which, whatever the exact share, means the cause is usually within reach. Your number comes from your own records: the trip log, the maintenance and rewind history, scrap blamed on "the power", drive fault logs and twelve months of bills.

    How to measure what it costs your site

    Step 1: record for a few weeks. A power quality recorder logs voltage and current continuously and captures the waveform of every event. One goes on the site incomer and another on the panel feeding the equipment that keeps stopping. They clamp on, usually without an outage. Two to four weeks normally catches a representative set of events. Seasonal problems need longer.

    Step 2: compare the readings with the published limits.

    What you measureThe limit to compare against
    Supply voltageThe European supply standard EN 50160 expects voltage within plus or minus 10 percent of nominal for 95 percent of each week, and counts any fall below 90 percent as a dip
    Harmonics (THD)The US standard IEEE 519 sets 8 percent voltage THD at low voltage and 5 percent at medium voltage; the UK's Engineering Recommendation G5/5 uses a 5 percent planning level at low voltage
    Sags your equipment should surviveThe ITIC curve, an industry tolerance envelope for IT equipment, expects ride-through of a drop to 70 percent for half a second; the semiconductor industry's SEMI F47 standard asks for 50 percent for 200 milliseconds

    If your drives trip on sags shallower than those envelopes, the drive settings are part of the fix as well as the supply.

    Step 3: match events to incidents. Line up the recorder's time-stamped events with the trip log and the production record. This is where the cost becomes a number you can act on, because each stoppage now has a cause next to it. A sag seen at the incomer came from the network. One seen only on the drive panel when the compressor starts came from inside your site. When the cause is disputed, or equipment keeps failing and the supplier blames the supply, a power quality root cause analysis takes the same measurements further.

    What drives the cost of a survey is mostly how many points are recorded, how many weeks the recorders stay in, whether any point needs an outage to fit, and how much analysis the report needs.

    Fix the cause, keep the equipment

    After a bad run of stoppages the temptation is to replace whatever failed last. Measurement usually points somewhere else, and the fix is often smaller than a new asset.

    For harmonics, the fix is a filter sized to the measured distortion, passive or active. Our guide to harmonic filters explains the options. The transformers and motors that were overheating stay in service and run cooler.

    For voltage sags that stop production, the choice depends on how deep and how long the sags are. Drive settings handle shallow ones for almost nothing, and deeper or more frequent sags need a device that holds the voltage up; our comparison of the fixes for voltage sags, from drive settings to a DSTATCOM sets them side by side, and STATCOM vs SVC covers sites that also need fast reactive power support for the network.

    For power factor, check the correction equipment you already have before buying new. A bank with a failed step or a faulty controller is a common reason the charge comes back, and repairing it usually costs less than a new bank.

    Sometimes the fix is a loose neutral connection, a drive's undervoltage trip set too tight, or a transformer that is simply overloaded. That is why measurement comes before purchasing. Equipment that has been running hot for years is usually still worth keeping once the cause is removed. A condition check is sensible. Replacement is the exception, and it should follow test results, not a bad month.

    What to do next

    1. Do you have stoppages nobody can explain, especially ones that line up with storms, a large machine starting or a particular time of day?
    2. Is anything running hot or failing early, in particular transformers, motors and capacitors on circuits with drives?
    3. Is there a reactive power or power factor line on your bill, or have consumption charges risen without a matching rise in output?

    One yes is reason enough to put a recorder on the incomer for a month.


    Unexplained stoppages, or equipment running hot? We run power quality studies for commercial and industrial sites, find the cause and specify the fix, keeping the equipment you already own wherever the test results allow. Send a month of half-hourly data or your trip log, and we will tell you what we would measure first. Send an enquiry, email sales@severnde.co.uk (UK) or sales@renewable-d.com (US), or call +44 116 279 6131 (UK) or +1 414 562 6559 (US).

    Frequently asked questions

    What does poor power quality cost a business?

    It depends on the site, which is why measurement matters. The visible cost is stoppages: in one published case a single production line lost about $100,000 a year to voltage sags that each lasted under a second. The less visible costs are shortened equipment life, higher electricity bills and output lost by running the plant cautiously.

    How do I know if my site has power quality problems?

    The usual signs are unexplained drive or controller trips, transformers or motors running hot, power factor correction capacitors failing, and a power factor or reactive power charge on the bill. To confirm it, put a power quality recorder on the incomer and the affected panel for two to four weeks, then compare the events with your trip log and the published limits.

    Can poor power quality damage equipment?

    Yes, mostly through heat. Harmonic currents add losses in transformers, motors and cables and run them hotter than their rating assumes, which shortens insulation life. Voltage sags and transients stress drives and controllers. Removing the cause with a filter or voltage support usually lets the existing equipment stay in service.

    Working on a project like this?

    Talk to our engineering team about your site, your grid connection or your power quality problem.

    Get in touch
    GET IN TOUCH

    Let's Solve Your Power Challenge.

    Send an enquiry to our engineering team. We'll help you identify risks and uncover efficiency opportunities.

    North America

    Renewable Energy & Drives

    5325 S Moorland RdNew Berlin, WI 53151United States

    UK & Europe

    Severn Drives & Energy

    Units 2 & 3, Kingsley Business ParkNew Road, Kibworth BeauchampLeicestershire, LE8 0LEUnited Kingdom

    Send an enquiry

    Fill out the form below and we'll be in touch.