Factory-assembled power conversion skid, built to the capacity each project requires, with 33/0.69 kV rectification, DC link battery voltage support and 0.69/11 kV inversion. Fault ride-through and fast fault current injection performed by the converter output stage. IP54, C3 anti-corrosion, ONAN cooling. Brochure figures are for the certified 5 MVA reference build.
GridLink provides a controlled electrical interface between a generator and a private consumer, delivering part or all of the generator's output directly to site, either as an islanded supply or in parallel with the public grid. At its core is a power electronics converter that manages voltage, frequency and active power flow.
The G99 variant addresses a change in regulatory interpretation of G99: the converter's output stage now performs fault ride-through (FRT) and fast fault current injection (FFCI) directly, removing dependency on the generator's own ride-through capability and the earlier disconnection interlock. The 5 MVA skid footprint and interfaces are unchanged from the original variant.
Figures are indicative and subject to change; project-specific ratings and certified data are confirmed per project.
Fault ride-through compliant to G99. Power conversion system blocks are certified against G99 by TÜV Rheinland. Type-test reports, G99 witness-test certificates and TÜV Rheinland certification are available to support DNO connection applications.
Battery enclosure: 10-year design life, 2-year warranty.
Connect with our engineering team for a technical consultation. We'll help you identify risks and uncover efficiency opportunities.
5325 S Moorland RdNew Berlin, WI 53151United States
Units 2 & 3, Kingsley Business ParkNew Road, Kibworth BeauchampLeicestershire, LE8 0LEUnited Kingdom
Fill out the form below and we'll be in touch.