
Filter by size, voltage, battery type and certification, then open a product for its specifications, datasheets and warranty.
Showing 12 of 12 products.
50 kW – 4.8 MW · three-in / three-out · LV
View product
250 kW – 16 MW · 208 V – 15 kV
View product
2.25 – 22.5 MW (2.5 – 25 MVA) · 5 – 25 kV
View product1200 – 3600 kvar · 3 – 35 kV · 3-level IGBT
View product6 / 10 / 27.5 / 35 / 55 kV · to 200 Mvar tested
View product
Distributed transmission voltage support
View product
365 kWh – 50 MWh+ · 400 V to 35 kV
View productGrid interface for energy storage systems
View product263 kW / 263 kVA · 380 V
View productBuilt to project rating · G99 FRT compliant · TUV Rheinland certified
Islanded or dual-connection private wire interface
View productBT40-40
40 × 12 V 40 Ah VRLA · 2 × 20 strings · ± 120 Vdc
When a manufacturer retires a product line, the installed base does not retire with it. Systems keep running, and their owners lose access to the documentation, spares and expertise they were promised for the life of the asset.
RE&D acquired the PureWave power quality business precisely so that would not happen to this fleet. If you operate a PureWave UPS, DSTATCOM or SMS system, the literature on each product page is yours to download, and the field service, spares and refurbishment behind it are still available.
Because the intellectual property sits with us rather than a manufacturer that walked away, none of this is limited to keeping existing assets alive. Given a real requirement, we can build it. If you want one, start the conversation and we will tell you honestly what it takes.
Instruction sheets, installation drawings and commissioning documentation for legacy systems are held rather than published. Tell us the system and the serial, and we will send what we have.
Spares, refurbishment, field service and expansion are all still available for legacy PureWave, DSTATCOM and STATCOM fleets, and for third-party equipment whose original supplier has moved on. Refurbishment is usually a fraction of replacement cost, and avoids the outage that a new asset would force.
Connect with our engineering team for a technical consultation. We'll help you identify risks and uncover efficiency opportunities.
5325 S Moorland RdNew Berlin, WI 53151United States
Units 2 & 3, Kingsley Business ParkNew Road, Kibworth BeauchampLeicestershire, LE8 0LEUnited Kingdom
Fill out the form below and we'll be in touch.